Mo – Fri 8:00 AM – 5:00 PM info@stort-slurf.uk

Delivery within 48 hours*

Original Developer

 Online Store

4.5/5 Rating

Delivery within 48 hours*

 Online Store

Original Developer

4.5/5 Rating

Delivery within 48 hours*

 Online Store

Original Developer

 4.5/5 Rating

How To Use The Flexible Rubble Chute?

To make things as easy and clear as possible, we’ve created a step-by-step guide below. You can also watch our video tutorial by clicking the link.

1 – Attach The Flexible Rubble Chute to the Filling Funnel

The first step is to attach the flexible rubble chute to the filling funnel, which can be ordered through our online shop. While it’s also possible to use the chute without the funnel or to connect it to your own setup, we strongly recommend using the filling funnel for optimal performance.

2 – Connect additional sections if necessary

The second step is to connect multiple sections, if needed. This process is very simple, and every order includes free connecting materials. Each flexible rubble chute is 3 metres long and can easily be connected to another section or shortened as required.

3 – Secure the funnel to the building

You can now attach the flexible rubble chute and filling funnel to the building. We recommend bringing the chute inside to the desired floor and unfolding it outward from there. Alternatively, you can lift the chute from the outside using a rope.

4 – Secure the flexible rubble chute firmly to the container (or another object on the ground)

The fourth step is to attach the flexible rubble chute to the container on the ground. It can also be fastened to a Big Bag, wheelbarrow, or another suitable receptacle.

Make sure the end of the chute is no more than 50 cm above the container. Mounting it higher is not recommended, as it may compromise safety for you and your surroundings.

5 – Start using the flexible rubble chute to dispose of debris

Now it’s time to dispose of your rubble. You can do this using a bucket, wheelbarrow, or by dropping loose materials directly into the flexible rubble chute. Make sure the chute is set up as vertically as possible, without any bends or kinks.